All Posts
Product Updates
|
0 Min Read
|

Class Scheduling

Covalent Class Scheduling gives industrial teams one shared calendar to plan training, pair trainers with trainees, track progress, and catch overdue training before it impacts production.

Table of Contents
    This is some text inside of a div block.
    New in Covalent
    Class Scheduling

    Class scheduling brings trainers, trainees, and objectives onto one calendar, so you can see what is planned, who is running it, and what is at risk of slipping.

    Why this matters

    Training you can see coming

    For industrial companies, training happens whenever a trainer and trainee find time. It's opportunistic. There is no forward plan, so leaders cannot see who is being trained, by whom, or when it will finish.

    That makes it hard to balance trainer load, protect production, or catch training that is falling behind until it is already late.

    Covalent puts training on a shared calendar, with trainers paired to trainees and a clear view of what is on track and what is overdue.

    1 Schedule a window and locationSet a planned start and finish, for example 1 hour for a classroom session or 10 days for OJT
    2 Pair trainer and traineeMatch availability and trainer capacity
    3 Track progressSee what is on track and likely to complete
    4 Catch what slipsOverdue starts and completions surface automatically

    What you get

    Plan and manage training in one place

    Four capabilities working together so training is something you plan ahead, not something you reconstruct after the fact.

    Schedule training windows

    Set planned start and completion dates for assigned objectives and groups, across employee calendars and long time horizons. You can also set a location, including a classroom for instructor-led sessions.

    • Plan training weeks or months ahead
    • Schedule windows for objectives and groups
    • Set a location or classroom for the session
    • See the whole team on one calendar
    Pair trainers to trainees

    Match each trainee to a trainer for the scheduled period, with trainer capacity and availability built into the plan.

    • Respect how many trainees a trainer can take at once
    • Account for shift and availability
    • Balance load across your trainers
    Track likely completion

    See how training is progressing and when each window is likely to finish, against the time it actually takes.

    • Compare the planned window to actual duration
    • Spot training likely to run long
    • Keep ramp plans realistic
    Catch overdue training

    Training that starts or finishes late surfaces on its own, so nothing sits unnoticed until it is a problem.

    • Overdue starts flagged automatically
    • Overdue completions flagged automatically
    • Act before it affects the floor

    Product preview

    A look at what your team will use

    Simplified views of the training calendar and how scheduled windows work.

    COVALENTTraining SchedulingWeekMonthTraining CalendarFeb 22 - Feb 28, 2026ScheduledOverdueCompletedEMPLOYEESUN 22MON 23TUE 24WED 25THU 26FRI 27SAT 28CICarlos IbarraAssembly III · TraineeMWMarcus WebbAssembly II · TrainerPNPriya NanduriAssembly III · TrainerDSDmitri SorelAssembly I · TraineeEngine Assembly Step 4Engine Assembly Step 4Torque Wrench CalibrationEngine Assembly Step 4Safety Inspection ProtocolHydraulic System CheckTorque Wrench CalibrationConcurrent windows stack within a row. Click a window to open it.
    Training calendar
    The whole team's training on one calendar

    See every scheduled training window across your workforce, color coded by status, with trainers and trainees in one view.

    • Week and month views across long horizons
    • Scheduled, completed, and overdue at a glance
    • Click a window to open its details
    Scheduled startScheduled completionCompleted on timeActual training durationOverdue completionlateActual training durationCovalent compares the plan to what actually happens and flags anything late.
    Windows and overdue
    Know what is on track and what is late

    A scheduled window sets the planned start and finish for a training. Covalent compares it to what actually happens and flags anything that slips.

    • Planned window measured against actual duration
    • Overdue start when training begins late
    • Overdue completion when it runs past the date

    Who benefits

    Real outcomes for every team that plans training

    The same capability, framed around what each team is accountable for.

    Training & L&D
    Plan trainer time with intent

    Lay out training weeks ahead, balance how many trainees each trainer carries, and keep ramp plans grounded in real availability instead of best guesses.

    Operations
    See readiness coming

    Know when people will finish training and be ready for the floor, so you can plan coverage around production instead of reacting to it.

    Quality
    Nothing slips quietly

    Overdue training surfaces on its own, and the schedule gives you a clear record that required training happened when it was supposed to.

    Good to know

    Common questions

    It covers many of the basics, especially for direct or technical workforces. You can schedule a training for a particular location, which can be a classroom. Instructors and trainers are synonymous. We are also adding enrollment and attendance concepts. Happy to chat through the finer details.

    It is a planned start and completion date for an assigned objective, with a trainer paired to a trainee for that period. The window sets the time the training should be completed within, for example ten calendar days.

    Two ways. An overdue start is training that has not begun by its scheduled start date. An overdue completion is training that has not finished by its scheduled completion date. Both surface automatically, so you can act before it affects the floor.

    Each trainer can be set to handle a number of trainees at once, and that can vary from one training to another. Scheduling respects this, so you do not overcommit a trainer beyond what they can realistically run.

    Yes. Windows are scheduled against the same assigned objectives and groups the rest of Covalent already tracks, so the plan sits on the same records as the work and the sign-offs rather than in a separate tool.

    See it on your own training calendar

    We will walk through how scheduling windows, trainer pairing, and overdue tracking fit the way your team already runs training.

    Book a walkthrough

    Related posts

    |
    May 27, 2025

    Covalent Achieves SOC 2 Type 2 Certification

    We are thrilled to announce that Covalent has earned SOC 2 Type 2 certification, further solidifying our commitment to the highest standards of security, availability, and confidentiality.

    This is some text inside of a div block.
    Read More
    |
    May 27, 2025

    Meet Covalent’s Director of Product Strategy, Yogi Rana

    We’re thrilled to introduce Yogi Rana, the latest addition to the Covalent team. In his role as Director of Product Strategy, he oversees the research and development of net new opportunities to expand our platform and add more value to customers.

    This is some text inside of a div block.
    Read More

    For updates and relevant market news, sign up for our newsletter below!

    We send out a monthly newsletter containing all of our latest posts, studies, interviews and relevant news in our ecosystem. We promise we won't spam you and it's easy to unsubscribe if you do not want to receive the next month's email.

    Thank you! Your submission has been received!
    Oops! Something went wrong while submitting the form.
    Successfully submitted

    Thank you for joining our newsletter!
    We'll now keep you up to speed!